Location: Hermosa, Bataan to SBMA, Philippines
Client : NLEX Corporation
Role: Sole General Contractor
Completed: March 2021
Project Components:
- 108m long 2-Lanes Road with Maintenance Walkway Tunnel
- Tunnel Excavation (HDD Piloting and Hydraulic Breaker Excavation)
- Shotcreting with Wire-mesh Works
- Rock-bolts & Forepoling
- Steel Arch Supports (Structural I-beams)
- Drainage and Waterproofing Works
- Concrete Lining
- 180m long 2-Lanes with Shoulder Jadjad Bridge
- Bored-piling Works (ø1.0m, ø2.5m & ø3.0m)
- Substructure Works (Pile Caps, ø2.0m & ø3.0m Columns , Abutments)
- AASHTO Type IV Post-tensioned Girders (60m) and Structural Steel Girders (120m)
- Structural Components (Bearing Assemblies, Expansion Joints, Drains & Railings)
- 23.7m long 2-Lanes with Shoulder Argonaut Bridge
- Bored-piling Works (ø1.0m)
- Substructure Works
- AASHTO Type IV (22.82m)
- Structural Components (Bearing Pads, Expansion Joints, Drains & Railings)
- Earthworks (300k cu.m of Excavation and 80k cu.m of Embankment)
- Roadworks (Base Courses, 110k sq.m of Asphalt Pavements, PCCP)
- Drainage & Slope Protection Structures (RCPC, RCBC, Stone Masonry Retaining Walls & Sodding)
- Miscellaneous Structures (Concrete Barriers, Metal Guardrails, ROW Fence, Road Signages, Pavement Markings)
- Electrical Works (12m Double-arm / Single-arm Lamp Posts & Tunnel Lightings)