Location : Claveria, Misamis Oriental
Client: Mindanao Energy Systems, Inc.
Role: Sole Contractor
Completed: December 2012
Project Components: Concrete gravity dam with 38m high with 94,000 m3 capacity including consolidation grouting of the foundation, Slope Protection, Dam Intake (38m depth), Headrace (3m x 3m x 6km RCBC), Silting basin, Forebay / Surge pool, Powerhouse, Tailrace, Local interconnection facilities/ substation, Outlet channel.
Hydroelectric Power Plants
Location: Loboc, Bohol
Client: Sta. Clara Power Corporation
Project Components: Access Road & Temporary Bridge, Penstock (2.1mØ x 260m), Intake Structure, Inflatable Dam, Powerhouse, Slope Protection, Fencing & Landscape
Location: Naujan, Oriental Mindoro
Client: Catuiran Hydro Power Corp.
Role: Sole Contractor
Completed: December 2018
Project Components: Access road and bailey bridge, Intake dam structure,
Underground Twin Chamber Desander, Headrace Tunnel (3.2m Ø x 3.2km), Surge shaft (5m Ø x 25m), Penstock (2.7m Ø x 160m), Powerhouse w/ Tailrace, Switchyard, 69kV Transmission Line (19km)
Location : Caliraya, Laguna
Client: CBK Hydro Power Consortium
Role: Subcontractor for Civil Works
Completed: August 2004
Project Components: Upstream/downstream dam face including rehabilitation of the Lumot-Caliraya Waterway at Caliraya Hydropower Plant, Construction of new spillway – open gated type with its ogee crest elevation at 284.46 meters. It was designed for a maximum discharge of more than 500 cu.m per second, Rehabilitation & improvement of the existing Tunnel.
Location: Majayjay, Laguna
Client: CBK Hydro Power Consortium
Completed: August 2004
Project Components: Dam, Reservoir, Rehabilitation & Improvement of Headrace Tunnel (1.18km), Powerhouse
Location: Kalayaan, Laguna
Client: CBK Hydro Power Consortium
Role: Subcontractor for Civil & Underground Penstock Works
Completed: August 2004
Project Components: New access roads and service roads, Upper Penstock Earthworks, Sub-Horizontal Penstock from Anchor block P1to P5, Relocation of lighting towers at Kalayaan penstock and Kalayaan I powerhouse, Inclined Shaft Excavation (9mØ x 154m), Access Tunnel (5mØ x 120m @ 62˚ slope), Twin Penstock Gallery (3.5m x 20m), Bifurcation Cavern (12m x 50m), Concrete backfill of Penstock Pipe along 9mØ inclined shaft.
Location: Sabangan, Mountain Province
Client: Hedcor Sabangan, Inc. / Aboitiz Power Corporation
Role: Sole Contractor
Completed: May 2015
Project Components: Access roads (12km), slope Protection, powerhouse & switchyard, weir Intake Structure, desander, underground Penstock (1.5m Ø x 700m), Headrace Tunnel (3m Ø x 3.1km @ 7.8% gradient)
Location: Manolo Fortich, Bukidnon
Client: Hedcor Bukidnon, Inc. / Aboitiz Power Corporation
Role: Sole Contractor
Completed: December 2018
Project Components: Weir (13.7m W x 40m L x 6.8m H, Concrete Box Culvert (3m x 3m x 700m), Slope Protection, desander (21.2mW x 12.3mH 133mL, headrace Tunnel (4m Ø H x 6km), surge Tank (13m Ø x 24m H), penstock (2.17m Ø x 440m L), powerhouse, switchyard, access Road (8km) & River Crossing structures
Location: Baungon, Bukidnon
Client: Bubunawan Power Company, Inc.
Role: Sole Contractor
Completed: October 2013
Project Components: Powerhouse, River channel, Spillway, Access Road,
Penstock (2.6m Ø x 240m), Access Road (378m) with slope protection & concrete retaining wall.
Location : Benguet Province
Client: Hedcor, Inc.
Role: Sole Contractor
Completed: January 2012
Project Components: Weir Intake, Headrace Culvert, Desander, Penstock, Powerhouse, Tailrace Channel
Wind Farms
Location: Puerto Galera, Mindoro
Client: Philippine Hybrid Energy Systems, Inc. (PHESI)
Role: Sole Contractor
Completed: September 2018
Project Components: Earthworks, Foundations (8 units), Equipment laydown pads/ Hardstand, Access Roads, Drainage & Landscaping Works
Location: Pililia, Rizal
Client: Gamesa Eolica S.L. Unipersonal – Phils
Project Owner: Alternergy Philippine Holdings Corp.
Role: Sole Contractor
Completed: August 2015
Project Components: Balance of Plant. Access roads, Foundations – 27 units, Earthworks, Installation of Anchor Bolts for 27 Wind Turbine Generators.
Location : San Lorenzo, Guimaras
Client: Trans-Asia Renewable Energy Corp. & Kanematsu Corporation
Role: Sole Contractor
Completed: January 2015
Project Components: Balance of Plant. Access roads, Foundations – 27 units, Earthworks, Installation of Anchor Bolts for 27 Wind Turbine Generators
Solar Power Plants
Location: Toledo, Cebu
Client: Citicore Power, Inc.
Role: Sole Contractor
Completed: February 2016
Project Components:
- Design & Build of the Balance of Plant (BOP)
- Site Development Design & Build (73.81 hectares), Drainage System Works, Installation, Electrical, Cabling & Termination of Solar Modules.
Location: Morong, Bataan
Client: Solar Powered Agri-rural Communities Corp.
Role: Sole Contractor
Completed: March 2016
Project Components: Site Development Design & Build, Drainage System Works, Installation, Electrical, Cabling & Termination of Solar Modules.